Skip to main content
1708966916559 f62316d6
|

By Numbers: National Oil Corporation Reveals Production Rates through Well Exploration and Rehabilitation by Its Subsidiaries

The National Oil Corporation and its subsidiaries have recently revealed increased production rates through the exploration and rehabilitation of several wells. The transition from observation well (HH59-65) to a production well in the Masla oil field by the Arabian Gulf Oil Company resulted in a production rate of approximately 2,104 barrels per day. Similarly, the observation well (C309-65) was converted to a production well with a rate of 1,134 barrels per day. Additionally, the well (V01-NC8A) in the Hamada field was rehabilitated to produce over 320 barrels per day.

In the Al-Lib field’s southeastern contract area (M.N.6), Sirte Oil Company drilled the exploratory well (WWWWW1-6) with a production rate of 16.8 million cubic feet of gas per day and 626 barrels of oil per day. Well (A1-NC107) was rehabilitated in block NC 107, yielding 2,400 barrels of crude oil daily, while well (A3-NC107) in the same block produced 600 barrels per day. The NC-149 block saw the completion of oil well (D-28-H) with a daily production of 2,000 barrels of crude oil, and in block NC-6, well (DDDD-2) was completed with a production rate of 600 barrels per day. Additionally, well (Q-1) in block NC-101 produced 500 barrels per day, well (UU-42) in block NC-6 produced 400 barrels per day, well (C347) in block NC-6 produced 1,000 barrels per day, and well (E-03) in block NC-101 yielded an increase of approximately 5,000 barrels of oil.

In the Abu Attifel field, Mellitah Oil & Gas Company rehabilitated well (A75), achieving a production rate of 4,000 barrels per day, and explored well (A1) with a rate of 2,773 barrels per day. In the Elephant field, the fifth well (FB-21HOR-ST2) produced 3,820 barrels per day. Wells (1-16) and (1-71) in Abu Attifel were rehabilitated, producing 3,333 barrels of oil and 9 million cubic feet of gas daily. Well (27-B4) in the Bouri field was rehabilitated with a rate of 1,200 barrels per day, while the recovery well (B4-49) was completed with a rate of 1,800 barrels of oil per day. In the Elephant field, well (FC25) produced 7,500 barrels per day, and the fourth well was re-drilled to yield 3,500 barrels per day.

In the Sharara field, Akakus Oil Operations Company completed several wells: well (B-23-H) with a production rate of 1,644 barrels per day, well (B-24-H) with 1,606 barrels per day, well (B-25-H) with 1,744 barrels per day, well (H-48) with 734 barrels per day, well (B-50) with 1,890 barrels per day, well (B-49-H) with 1,921 barrels per day, and well (B-48) with 1,464 barrels per day. Heavy maintenance was completed on several wells in Sharara: well (A-28) producing 966 barrels per day, well (A-24) with 1,141 barrels per day, well (B-46) with 1,061 barrels per day, well (J-12) with 548 barrels per day, well (R-17) with 714 barrels per day, well (B-17-H) with 220 barrels per day, well (H-05) with 205 barrels per day, well (K-01) with 319 barrels per day, and well (O-01) with 291 barrels per day.

Share
Views: 0